Prince Edward County, VA
Home MenuHeartland Innovative Technology (HIT) Park
Want to learn more about Prince Edward County's Innovative Technology Park? Read below or download a brochure for more information.
Site Specifications
- Site Size: 280+ Acres (with Expansion Possibilities)
- Potential Build-out: Up to 1.3M+ SF
- Zoning: C1 – Data Center By-Right
- Electrical: Dominion Energy 230kV & 115kV Transmission On-Site with Large Scale Capacity
- Current Dominion Energy Data Center Electric Rates as Low as $0.0475 / kWh with Qualifying Economic Development Incentives
- Fiber: Open Access Fiber Backbone with MBC & Diverse Fiber Paths
- Dark Fiber Connections to Primary Backbone Networks – SummitIG, Lumen Networks (formerly CenturyLink & Level3), Shentel & Comcast
- Real Estate Tax Rate: $0.51 per $100 Assessed (Lowest 10% in Virginia)
- Personal Property - Data Center Equipment Tax Rate: $1.00 per $100
- Hotel Rooms: 500+ within 30 Minutes
- Airports: Lynchburg Regional Airport Approx. 52 Miles/Charlottesville Albermarle Airport Approx. 60 Miles/Richmond International Airport Approx. 70 Miles/
- Raleigh-Durham International Airport Approx. 125 Miles/Piedmont Triad International Airport Approx. 140 Miles
- Water: Town of Farmville / Prince Edward County
- Water Capacity: Water Infrastructure Extension Projects In Design Projecting Up to 1.2 MGD from Town of Farmville /Up to 5.5 MGD from Proposed Sandy River Reservoir
- Educational: Longwood University Center for Cyber Security & Hampden-Sydney College Less Than 10 Minutes From Site
- Incentives: Competitive Data Center Incentives for Lowest Total Cost of Ownership (TCO)
- Within 2.0 Miles of Four-Lane US-460
Map of Planned Development Site
For further information, please contact:
Douglas P. Stanley, AICP ICMA-CM
County Administrator
Phone: 434.392.8837
Email: dstanley@co.prince-edward.va.us